0 pending sync
Connected
Connect to Cloud Database
One-time setup — takes 30 seconds
Your Cloudflare Worker URL (see deployment guide)
Set in Cloudflare Worker environment variables
Could not connect — check the URL and secret key, then try again.
What this does: Connects your drying forms to a Cloudflare KV database so any phone, tablet, or laptop can access all jobs. Clayton and Alexis both see the same data in real time.
Job Dashboard
Loading...
Active Jobs
Completed
Clients
Total Jobs
Jobs
Click to open
📋
Loading jobs...
Clients
Auto-fills on new jobs
👤
Loading...
JOB #—
Saved
IICRC S500 — Drying Goals
Materials must return to pre-loss EMC within 3–5 days.
S500 §12.4.3 — Cat · Class
≤50%
RH
≤16%
Wood MC
≤0.5
GPP Δ
Job Information
New
Client
Loss Classification
Ambient / Regional
Equipment Deployment
Room Assignments
RoomAir MoversDehuScrubberNotes
S500 Checklist
    Daily Monitoring
    Same time each day. GPP must decrease. RH → ≤50%.
    S500 §14.2
    ↓GPP
    Trend
    ≤50%
    RH
    Drying Curve
    GPP and RH trend by day — all rooms averaged
    Moisture Content Tracking
    All points must reach dry standard before equipment removal.
    S500 §15.1
    ≤16%
    Wood
    ≤1%
    Drywall
    Monitoring Points
    Color codes vs. dry goal
    RoomLocation / MaterialTypeToolBaselineDay 2Day 3Day 4Day 5GoalStatus
    Reference Readings
    Moisture Map
    Jobber Workflow
    Each visit: Complete Tabs 2–4 → Generate → Copy Internal Note → Jobber Job → Notes → Paste → Save
    Client update: Copy Email Summary → Jobber email → Send
    Closeout: All Tab 3 readings green → Generate final report → Email client "Drying Complete" → Save job → Mark Complete on dashboard